Modules B05–B06 · concept player
One projection, one formula: intensity = Td / (d + 2T). Slide tokens-in-flight and watch decode at batch 1 sit on the floor, then climb past the machine's ridge point into prefill territory as batching or sequence length grows.
Exact arithmetic on the module's formula, not a measurement. At d=4096 this reproduces B05's own worked points exactly: 1.0 at T=1, roughly 247 at T=281 (the machine's cited ridge point on MI300X), 1024 at T=2048. B05 section 2 derives the formula; decode at batch 1 uses about 0.4% of the machine's arithmetic because the cost there is entirely the weight read, not the multiply.